Enterprise architecture · Embedded in programmes

ProjectEA: enterprise architecture for transformation programmes

Senior architecture inside your ERP, cloud, data or AI programme, accountable to you rather than the systems integrator: the target architecture set, every design decision logged and challenged from your side of the table, and the systems you own on day two protected from the choices made for go live.

ProjectEA at a glance

Single programmefrom £45,000 + VAT
ERP and platform scalefrom £120,000 + VAT
Portfolio scalecustom fixed fee
Delivered bysenior architects, part time
Fees are fixed by programme tier, scoped to the programme, and agreed in writing before we start.

Definition

What is enterprise architecture for transformation programmes?

Enterprise architecture for transformation programmes puts a senior architect inside a live programme, accountable to the organisation rather than the vendor: setting the target architecture, running a weekly design authority, logging and challenging every significant design decision, and protecting the systems the organisation will own long after go live. It exists because programmes optimise for their go live date, and somebody has to optimise for the decade that follows.

Intelance delivers this as ProjectEA: TOGAF certified senior architects embedded part time at fixed fees by programme tier, from £45,000 + VAT for a single programme and from £120,000 for ERP and platform scale. Part time is deliberate: the value is in the decisions rather than the day count.

Not sure what the programme is landing on? The EA QuickScan provides the evidence base in ten working days, from £18,000 + VAT.

In practice, that means
01

Set the target

The architecture the programme must land on, decided on your side of the table.

02

Sit in the room

A design authority that runs weekly rather than a steering slide that arrives monthly.

03

Log every decision

Each significant choice challenged, priced and recorded while it can still be changed.

04

Protect day two

Decisions scored for the decade after go live as well as the date on the plan.

The failure modes

Six places programmes lose their architecture

Programmes rarely lose their architecture in one bad decision. They lose it quietly, in six places, while everyone watches the plan. Each one has a specific protection.

01

The vendor’s reference architecture

The systems integrator’s standard pattern, optimised for the systems integrator’s delivery rather than your estate.

ProtectedThe target architecture is yours, and the vendor’s pattern is tested against it.
02

Integration by accretion

Point to point connections added one deadline at a time, until nobody can draw the picture.

ProtectedIntegration decisions made once, deliberately, on a pattern.
03

Data model drift

The platform’s data model versus your reality, with the mismatch discovered at migration and priced at panic rates.

ProtectedThe mismatch found in design, when it is cheap to fix.
04

Customisation creep

Each customisation reasonable alone, and together a platform nobody can upgrade.

ProtectedCustomisations gated, priced and justified, or refused.
05

The dependencies nobody owns

Cross programme dependencies that everyone assumes someone else is watching, until one of them delivers otherwise.

ProtectedA dependency register with names against every line.
06

Day two blindness

Decisions optimised for the go live date that quietly tax your systems for a decade afterwards.

ProtectedEvery significant decision scored for the decade after go live.

How it embeds

From programme screen to day two handover

ProjectEA joins at any stage, including mid flight. The shape is the same wherever it starts: understand the programme, set the target, then hold the line until the handover.

Stage 1

Programme screen

The programme read as it stands: scope, vendor position, architecture decisions already made and the ones coming.

Stage 2

Architecture baseline

The target architecture set on your side of the table, with what exists today mapped honestly against it.

Stage 3

In the room

Your architect inside the programme: design authority run weekly, decisions challenged and logged as they happen.

Stage 4

Design gates

Gates the programme cannot talk its way through: customisations, integrations and data decisions priced and scored before they land.

Stage 5

Day two handover

The programme ends. The architecture does not. Decision log, dependency register and target architecture handed to the people who own the estate.

Already mid programme and drifting? Stage 1 works as a standalone read of where the architecture stands, and the findings are yours either way.

The alternatives

Your options side by side

Three ways programmes handle architecture. The difference shows up on day two, when the programme team has gone and the systems remain.

Vendor led architecture
Part time oversight
ProjectEA
What it is
The systems integrator designs what the systems integrator will build
A senior reviewer who sees the programme at steering
Your architect inside the programme, in the design authority weekly
Whose interest
Optimised for the vendor’s delivery and the vendor’s margin
Yours, but a month behind the decisions
Accountable to you, with no stake in the build
What reaches you
Decisions already made, presented for sign off
A slide, after the drift has happened
Every decision logged, priced and scored as it happens
Cost
Free on paper, paid for on day two
Cheap, then very expensive
Fixed fee by tier, from £45,000 + VAT, agreed before we start
Vendor led architecture
What it is

The systems integrator designs what the systems integrator will build

Whose interest

Optimised for the vendor’s delivery and the vendor’s margin

What reaches you

Decisions already made, presented for sign off

Cost

Free on paper, paid for on day two

Part time oversight
What it is

A senior reviewer who sees the programme at steering

Whose interest

Yours, but a month behind the decisions

What reaches you

A slide, after the drift has happened

Cost

Cheap, then very expensive

ProjectEA
What it is

Your architect inside the programme, in the design authority weekly

Whose interest

Accountable to you, with no stake in the build

What reaches you

Every decision logged, priced and scored as it happens

Cost

Fixed fee by tier, from £45,000 + VAT, agreed before we start

Scope

What this includes and what it does not

You get

01

A target architecture set on your side of the table, and defended.

02

A weekly design authority inside the programme, run by your architect.

03

A decision log with every significant choice challenged, priced and scored.

04

A dependency register with names against every line.

05

A day two handover to the people who own the estate after go live.

This is not

×

Delivery. We build nothing and take no implementation revenue, which is why the challenge is real.

×

A PMO. Plans, RAID logs and status reporting stay with the programme.

×

Independent assurance. When a board wants arm’s length verification, a separate team delivers it.

×

The operating model. Who owns architecture decisions after the programme is the EA Operating Model.

Why Intelance

The commitments we put in writing

01

Accountable to you alone

We build nothing, sell no platforms and take no implementation revenue from the programme, so the challenge in the design authority is real.

02

Every decision logged

Significant design choices are challenged, priced and scored as they happen, while they can still be changed, and the log is yours.

03

Part time by design and senior only

TOGAF certified senior architects, embedded for the decisions rather than the day count. No armies of juniors on your budget.

04

Fixed fee by programme tier

From £45,000 + VAT for a single programme, scoped to the programme and agreed in writing before we start.

05

Independent by design

When the board wants arm’s length assurance on a programme we architect, a different and independent team delivers it.

Who you will work with

Every engagement is led by a senior partner. Nothing is offshored and nothing is handed to a junior bench.

In the roomSenior TOGAF certified architects who sit in the design authority
The baselinePractitioners who map the estate directly rather than from the vendor pack
The gatesDecisions priced and scored by the people who challenged them
Specialist depthEstablished associates across cyber, data and AI where needed
The delivery record The registers behind every claim

Ready to talk?

Speak to a senior architect

Thirty minutes on the programme, where it stands and what the architecture needs. If it is already running and drifting, say so: ProjectEA joins mid flight, and the first output is an honest baseline of where the architecture stands.

FAQs

Questions about ProjectEA

How much does ProjectEA cost?

Fixed fees by programme tier: from £45,000 + VAT for a single programme, from £120,000 for ERP and platform scale, and custom fixed fees for portfolio scale. Every fee is scoped to the programme and agreed in writing before we start.

Can ProjectEA join a programme that is already running?

Yes, and it often does. The programme screen works mid flight: a clear read of where the architecture stands, which decisions are already locked, and which can still be influenced. The findings are yours whether or not the engagement continues.

How is this different from the systems integrator’s architects?

The vendor’s architects are good at their job, and their job is the vendor’s delivery. ProjectEA sits on your side of the table with no stake in the build, which changes what gets challenged and what reaches you before it is signed rather than after.

How much time does the architect spend embedded?

Part time by design, sized to the programme’s decision flow: typically the weekly design authority, the design reviews around it, and availability when decisions land between them. The value is in the decisions rather than the day count.

What is a design authority?

The forum where significant design decisions are made, challenged and recorded. ProjectEA runs it weekly inside the programme, with every decision logged, priced and scored for its impact on the estate after go live, so drift is caught in days rather than discovered at migration.

What happens when the programme ends?

The day two handover: the target architecture, decision log and dependency register passed to the people who own the estate, with the EA Operating Model or a Virtual EA Department as the usual homes for long term ownership. The programme ends. The architecture does not.

Does ProjectEA replace programme assurance?

No. ProjectEA works inside the programme on your behalf. Independent assurance verifies the programme from outside it. When a board wants arm’s length verification of a programme we architect, a different and independent team delivers it.

Who you will work with?

Senior TOGAF certified architects led by a senior partner, with established associates across cyber, data and AI governance where depth is needed. The person in your design authority is the person accountable for the advice. Nothing is offshored.